Do I Qualify
- Install within Newark's electric service territory and keep municipal accounts current.
- Use an approved contractor and provide system sizing, permits, warranty, and project documents.
- Obtain permission to proceed before installation.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Geothermal capacity, first two tons | EER ≥18; COP ≥3.6; residential installation or replacement. | $800 per ton |
| Geothermal capacity beyond two tons | EER ≥18; COP ≥3.6; residential installation or replacement. | $700 per ton |
Who Files It
The applicant and contractor sign the grant forms. The applicant can transfer payment to another named recipient.
The provider pays either the contractor or the homeowner.
The Steps to Apply
- Contact DEMEC about funding and payment timing before installation. Municipal grants.
- Submit the signed application and initial documents, then wait for approval.
- Install the approved system and submit final inspection, invoice, and warranty documents.
Read on October 22, 2026 from the City of Newark Electric page. A change to this program is a dated line in the changelog.