Do I Qualify
- Receive residential service from Minnesota Power or a participating utility.
- Use a participating contractor.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Ground-source heat pump | 2012 ENERGY STAR standards; open- or closed-loop new or replacement system | $800 per ton |
Who Files It
The participating contractor files for the homeowner.
The money is paid to the homeowner.
The Steps to Apply
- Have a participating contractor install the qualifying system by December 31, 2026.
- Have the contractor submit the paperwork.
Read on October 22, 2026 from the Minnesota Power page. A change to this program is a dated line in the changelog.