Do I Qualify
- Use a certified dealer. Callaway must collect the heat-load information required for geothermal eligibility.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Replacement of an existing dual-fuel heat pump | Gas backup; ENERGY STAR Cold Climate; minimum 8.1 HSPF2 | $300 per ton |
| New dual-fuel heat pump installation | Gas backup; ENERGY STAR Cold Climate; minimum 8.1 HSPF2 | $500 per ton |
| Ground-source heat pump unit replacement | ENERGY STAR Plus 2; closed-loop system | $150 per ton |
| First ground-source heat pump installation | ENERGY STAR Plus 2; closed-loop system | $850 per ton |
Who Files It
The member submits the relevant rebate application.
The Steps to Apply
- Contact Member Services before installation and submit the equipment application. Program page.
Read on October 22, 2026 from the Callaway Electric Cooperative page. A change to this program is a dated line in the changelog.