Do I Qualify
- Use new equipment. Supply the receipt and completed form within 90 days of purchase. Geothermal projects need a Manual J calculation.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Replacement ducted dual-fuel heat pump | Minimum 8.1 HSPF2 | $150 per ton |
| Ductless mini-split | Minimum 15.2 SEER2; no electric auxiliary heat | $150 per ton |
| Indoor ground-source heat pump replacement | At least 3 EER improvement; meet the listed system efficiency requirements | $150 per ton |
| Ground-source heat pump rebate ceiling | Efficiency depends on loop type and water-to-air or water-to-water equipment | $300 per ton |
Who Files It
The member submits the application.
The Steps to Apply
- Confirm the applicable tier and submit the paper or online form. Program page.
Read on October 22, 2026 from the New-Mac Electric Cooperative page. A change to this program is a dated line in the changelog.