Do I Qualify
- The service must use more than 6,000 kWh annually. Rebates are generally limited to half of total cost.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Ducted dual-fuel heat pump with existing fossil backup | Minimum 8.1 HSPF2 | $300 per ton |
| Ducted dual-fuel heat pump with new fossil backup | Minimum 8.1 HSPF2 | $500 per ton |
| Ductless mini-split | Minimum 15.2 SEER2; no electric resistance backup | $150 per unit |
| Ground-source heat pump replacement | Minimum 19.1 EER | $200 per ton |
| New ground-source heat pump and loop field | Minimum 19.1 EER | $750 per ton |
Who Files It
The member submits the equipment application.
The Steps to Apply
- Request the geothermal form or use the linked heat-pump application. Program page.
Read on October 22, 2026 from the Southwest Electric Cooperative, Bolivar page. A change to this program is a dated line in the changelog.