Do I Qualify
- Provide the AHRI certificate and invoice. New geothermal systems need sizing approval before installation.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Ducted heat pump with existing fossil backup | 8.1 HSPF2 or higher | $300 per ton |
| Ducted heat pump with new fossil backup | 8.1 HSPF2 or higher | $500 per ton |
| Ductless mini-split | ENERGY STAR; at least 15.2 SEER2 | $150 per unit |
| Ground-source heat pump replacement | ENERGY STAR +2; average 19.1 EER | $150 per ton |
| First ground-source heat pump installation | Preapproval; ENERGY STAR +2; average 19.1 EER | $750 per ton |
Who Files It
The member submits the residential application.
The Steps to Apply
- Choose the equipment application. Obtain geothermal preapproval when required. Program page.
Read on October 22, 2026 from the White River Valley Electric Cooperative page. A change to this program is a dated line in the changelog.