Cities / New Jersey / Rebates

Atlantic City Electric Residential Electrification Program: Open

Enrollment for 2026 is open. Open. Atlantic City Electric offers rebates on electric equipment. Work with your contractor to submit an application.

Serves: Atlantic, Burlington, Camden, Cape May, Cumberland, Gloucester, Ocean and Salem counties.

Do I Qualify

  • Replace gas, oil or propane equipment at an Atlantic City Electric residence.
  • Use an approved participating contractor.
  • Replacing existing electric equipment does not qualify for this conversion program.

How Much Comes Off

Atlantic City Electric Residential Electrification Program — program page · rebate chart
EquipmentRequirementAmount
Full-displacement cold-climate heat pumpNEEP-listed; ducted SEER2 > 14.3, HSPF2 > 7.7, COP > 1.75 at 5°F; ductless SEER2 > 15, HSPF2 > 8.5, COP > 1.75 at 5°F$10,000 per house
Full-displacement heat pump, moderate incomeSame ducted or ductless cold-climate requirements; moderate-income qualification$12,000 per house
Partial-displacement cold-climate heat pumpSame ducted or ductless cold-climate requirements; integrated controls$5,000 per house
Dual-fuel cold-climate heat pump, moderate incomeSame dual-fuel requirements; moderate-income qualification$6,000 per house
Additional cold-climate heat pumpAdditional qualifying smaller or equally sized system$2,000 per unit
Additional standard air-source heat pumpSEER2 ≥ 15.2, EER2 ≥ 11.7, HSPF2 ≥ 7.8$750 per unit
Partial-displacement standard heat pumpSEER2 ≥ 15.2, EER2 ≥ 11.7, HSPF2 ≥ 7.8$2,000 per house
Partial-displacement standard heat pump, moderate incomeSame standard heat-pump requirements; moderate-income qualification$4,000 per house
Ground-source heat pump replacing gasOpen loop EER > 21.1, COP > 4.1; closed loop EER > 17.1, COP > 3.6$3,000 per 10,000 BTUh
Ground-source heat pump replacing delivered fuelOpen loop EER > 21.1, COP > 4.1; closed loop EER > 17.1, COP > 3.6$4,000 per 10,000 BTUh
Ground-source moderate-income bonusQualifying ground-source project; moderate-income qualification$1,000 per 10,000 BTUh

Who Files It

The participating contractor supplies the project application. Payment can go to the customer or to the contractor with signed assignment.

The provider pays either the contractor or the homeowner.

The Steps to Apply

  1. Confirm the fuel-conversion pathway and required controls before installation.
  2. Submit the application, invoice, certificates, photos and any decommissioning documents within 90 days of installation. Application.

Read on October 22, 2026 from the Atlantic City Electric page. A change to this program is a dated line in the changelog.