Cities / New Jersey / Rebates

JCP&L Clean Comfort Program: Open

Enrollment for 2026 is open. Open. The Clean Comfort Program has rebates for energy-efficient equipment. Download the application and submit the required documents.

Serves: Burlington, Essex, Hunterdon, Mercer, Middlesex, Monmouth, Morris, Ocean, Passaic, Somerset, Sussex, Union and Warren counties.

Do I Qualify

  • Be a residential JCP&L customer in an existing single-family home.
  • Replace fossil-fuel heating. Use a qualified contractor and meet the sizing and inspection requirements.
  • Existing electric heating replacements and new construction do not qualify for this conversion program.

How Much Comes Off

JCP&L Clean Comfort Program — program page · rebate chart
EquipmentRequirementAmount
Full-displacement cold-climate heat pumpDucted: SEER2 > 14.3, HSPF2 > 7.7, COP 5°F > 1.75; ductless: SEER2 > 15, HSPF2 > 8.5, COP 5°F > 1.75; NEEP requirements$10,000 per primary system
Full-displacement heat pump, moderate incomeSame cold-climate requirements; moderate-income qualification$12,000 per primary system
Cold-climate heat pump with integrated controlsDucted or ductless; NEEP requirements; covers the full heating load; integrated fossil-fuel controls$5,000 per largest system
Dual-fuel heat pump, moderate incomeSame dual-fuel requirements; moderate-income qualification$6,000 per largest system
Additional cold-climate heat pumpAdditional qualifying ducted or ductless ccASHP needed for the heating load$2,000 per unit
Additional standard heat pump or mini-splitSEER2 ≥ 17.1, EER2 ≥ 11.7, HSPF2 ≥ 7.8$750 per unit
Ground-source heat pump replacing gasENERGY STAR certified; sized for the full heating load$4,000 per 10,000 Btu/h
Ground-source heat pump replacing delivered fuelENERGY STAR certified; sized for the full heating load$5,000 per 10,000 Btu/h
Ground-source moderate-income bonusQualifying ground-source project; moderate-income customer$1,000 per 10,000 Btu/h

Valid from February 1, 2026 to June 30, 2027.

Who Files It

The participating contractor submits the project documents. Payment goes to the account holder or to the contractor with signed assignment.

The provider pays either the contractor or the homeowner.

The Steps to Apply

  1. Have the contractor confirm the conversion pathway before installation. Program requirements.
  2. Submit the signed application, invoice, permits, certificates and before-and-after photos within 120 days of installation.

Read on October 22, 2026 from the JCP&L page. The chart was printed 02-2026. A change to this program is a dated line in the changelog.