Do I Qualify
- Replace existing equipment one-for-one through a Texas-licensed HVAC contractor.
- Below 45,000 BTUh, AC needs 14.3 SEER2 and 11.7 EER2; larger AC needs 13.8 SEER2 and 11.2 EER2.
- Heat pumps need 14.3 SEER2, 11.7 EER2 and 7.5 HSPF2. At 15.2+ SEER2, minimum EER2 becomes 9.8.
- Early replacement requires working equipment under 25 years old for central AC or under 20 for heat pumps, with equipment photos.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Central AC: early replacement | 13.8–15.1 SEER2 | $115 per cooling ton |
| Central AC: early replacement | 15.2–16.1 SEER2 | $130 per cooling ton |
| Central AC: early replacement | 16.2–17.0 SEER2 | $175 per cooling ton |
| Central AC: early replacement | 17.1–19.9 SEER2 | $250 per cooling ton |
| Central AC: early replacement | 20.0+ SEER2 | $310 per cooling ton |
| Central AC: burnout | 13.8–15.1 SEER2 | $90 per cooling ton |
| Central AC: burnout | 15.2–16.1 SEER2 | $120 per cooling ton |
| Central AC: burnout | 16.2–17.0 SEER2 | $150 per cooling ton |
| Central AC: burnout | 17.1–19.9 SEER2 | $225 per cooling ton |
| Central AC: burnout | 20.0+ SEER2 | $275 per cooling ton |
| Heat pump: early replacement | 13.8–15.1 SEER2; equipment minimums still apply | $115 per cooling ton |
| Heat pump: early replacement | 15.2–16.1 SEER2 | $130 per cooling ton |
| Heat pump: early replacement | 16.2–17.0 SEER2 | $175 per cooling ton |
| Heat pump: early replacement | 17.1–19.9 SEER2 | $250 per cooling ton |
| Heat pump: early replacement | 20.0+ SEER2 | $310 per cooling ton |
| Heat pump: burnout | 13.8–15.1 SEER2; equipment minimums still apply | $90 per cooling ton |
| Heat pump: burnout | 15.2–16.1 SEER2 | $120 per cooling ton |
| Heat pump: burnout | 16.2–17.0 SEER2 | $150 per cooling ton |
| Heat pump: burnout | 17.1–19.9 SEER2 | $225 per cooling ton |
| Heat pump: burnout | 20.0+ SEER2 | $275 per cooling ton |
| Mini-split: early replacement | 13.8–15.1 SEER2; equipment minimums still apply | $115 per cooling ton |
| Mini-split: early replacement | 15.2–16.1 SEER2 | $130 per cooling ton |
| Mini-split: early replacement | 16.2–17.0 SEER2 | $175 per cooling ton |
| Mini-split: early replacement | 17.1–19.9 SEER2 | $250 per cooling ton |
| Mini-split: early replacement | 20.0+ SEER2 | $310 per cooling ton |
| Mini-split: burnout | 13.8–15.1 SEER2; equipment minimums still apply | $90 per cooling ton |
| Mini-split: burnout | 15.2–16.1 SEER2 | $120 per cooling ton |
| Mini-split: burnout | 16.2–17.0 SEER2 | $150 per cooling ton |
| Mini-split: burnout | 17.1–19.9 SEER2 | $225 per cooling ton |
| Mini-split: burnout | 20.0+ SEER2 | $275 per cooling ton |
Valid from February 1, 2026 to January 31, 2027.
Who Files It
The account holder signs and submits within 30 days. An authorized contractor can receive a check if the discount appears on the invoice.
The provider pays either the contractor or the homeowner.
The Steps to Apply
- Confirm the efficiency tier and replacement category. Program page.
- Submit the signed application, invoice, AHRI certificate and required permit details. Program page.
Read on October 22, 2026 from the CPS Energy page. A change to this program is a dated line in the changelog.