Cities / Washington / Rebates

Pacific Power Heat Pumps for Named Communities: Open

Enrollment for 2026 is open. Open. Washington Named Community residential customers may qualify for enhanced incentives.

Serves: Pacific Power service area in Yakima, Walla Walla and surrounding communities.

Do I Qualify

  • Meet the standard Wattsmart requirements for an existing single-family home on residential Schedule 16, 17 or 19.
  • The address must qualify as a Named Community through the provider's eligibility check.
  • Eligible census tracts meet the provider's highly impacted community or vulnerable population criteria.
  • Use a qualified Trade Ally. Get conversion preapproval before equipment removal.
  • An existing ducted heat pump replacement does not qualify for a conversion payment.

How Much Comes Off

Pacific Power Heat Pumps for Named Communities — program page · rebate chart
EquipmentRequirementAmount
Heat pump conversion from electric resistance or natural gas8.5 HSPF/14 SEER or 7.2 HSPF2/13.3 SEER2; eligible Named Community.$2,250 per heat pump
Heat pump conversion from wood, oil or propane8.5 HSPF/14 SEER or 7.2 HSPF2/13.3 SEER2; eligible Named Community.$2,500 per heat pump
Ductless heat pump replacing electric resistance or natural gas heating9 HSPF or 8.1 HSPF2; eligible Named Community.$1,800 per ductless heat pump
Ductless heat pump replacing wood, oil or propane heating9 HSPF or 8.1 HSPF2; eligible Named Community.$2,000 per ductless heat pump

Valid from January 1, 2026.

Who Files It

The account holder signs the application and the Trade Ally completes the equipment section. Payment normally goes to the account holder. An approved third-party payment requires the payment addendum.

The provider pays either the contractor or the homeowner.

The Steps to Apply

  1. Check the installation address for Named Community eligibility. Check address eligibility.
  2. Hire a qualified Trade Ally and obtain any required conversion preapproval. Find a Trade Ally.
  3. Submit the signed application, invoice and required equipment documents. Heat pump application.

Read on October 22, 2026 from the Pacific Power page. The chart was printed Effective 1/1/2026, V 06/11/2026. A change to this program is a dated line in the changelog.