Cities / West Virginia / Rebates

Appalachian Power Home Performance Program: Open

Enrollment for 2026 is open. Open: Schedule Your Home Energy Assessment Now.

Serves: West Virginia single-family homeowners served by Appalachian Power.

Do I Qualify

  • Your existing home has Appalachian Power residential electric service in West Virginia.
  • Your home uses electric heat.
  • An approved contractor installs the equipment and submits the rebate.
  • Self-installed work and fuel switches do not qualify.
  • Ask your energy advisor whether your income qualifies you for a larger rebate.

How Much Comes Off

Appalachian Power Home Performance Program — program page · rebate chart
EquipmentRequirementAmount
Air-source heat pump replacing an air-source heat pump15 to 19 SEER; existing system must be Air Source Heat Pump.$450 per upgrade
Air-source heat pump replacing electric resistance heat15 to 17 SEER; existing system must be Electric Furnace or Electric Baseboard or Electric Resistance heat.$600 per upgrade
Mini-split replacing an air-source heat pump19-SEER; existing system must be Air Source Heat Pump.$350 per upgrade
Mini-split replacing electric resistance heat19-SEER; existing system must be Electric Furnace or Electric Baseboard or Electric Resistance.$750 per upgrade
Ground-source heat pumpEER ≥ 16.1; COP ≥ 3.1; ENERGY STAR certified; must replace existing electric resistance heat.$750 per upgrade
Smart thermostatReplace a non-programmable thermostat; connect to Wi-Fi; meet ENERGY STAR requirements.$50 per thermostat

Who Files It

An approved contractor files and manages the claim. The rebate is paid directly to the customer.

The money is paid to the homeowner.

The Steps to Apply

  1. Schedule the home energy assessment through the program. Home Performance Program.
  2. Have an approved contractor confirm your existing heating type and the equipment requirements.
  3. Have the contractor submit the claim within 45 days after completing the work.
  4. Arrange the required inspection within 90 days after installation.

Read on October 22, 2026 from the Appalachian Power page. A change to this program is a dated line in the changelog.