Cities / California / Rebates

Home Performance Plus: Open

Enrollment for 2026 is open. Open: Find a Home Performance Plus Trade Ally to get started.

Serves: Southern California Edison residential electric customers within Disadvantaged or Low-Income communities.

Do I Qualify

  • Receive SCE residential electricity service in a qualifying disadvantaged or low-income community.
  • Use an existing single-family home or an eligible building with no more than four units.
  • Use a participating contractor. The application portal requires filing within 90 days after installation.
  • New construction does not qualify. Some portal measures also exclude customers participating in state assistance programs.

How Much Comes Off

Home Performance Plus — program page · rebate chart
EquipmentRequirementAmount
Split/package central air conditionerAt least 16 SEER2 and 12.6 EER2; AHRI rated; capacity at least 18,000 and below 65,000 Btuh.$424 per Ton
Ducted heat pump replacing an existing heat pumpAt least 16 SEER2, 8.0 HSPF2 and 12.6 EER2; AHRI rated; capacity at least 18,000 and below 65,000 Btuh.$424 per Ton
Ducted central heat pump replacing gas furnace and ACAt least 16 SEER2; replace AC rated no higher than 13 SEER or 12.4 SEER2 and a gas furnace rated no higher than 80% AFUE.$667 per ton
Ductless mini-split replacing gas wall furnace and window ACAt least 16 SEER2 and 8.1 HSPF2; AHRI rated; replace a gas wall furnace rated no higher than 67% AFUE and a qualifying window AC.$1,145 per Ton
Ductless mini-split replacing gas wall furnace onlyAt least 16 SEER2; replace a gas wall furnace without a blower fan rated no higher than 67% AFUE.$600 per ton

Who Files It

A Home Performance Plus participating contractor submits the application for the homeowner.

The provider pays either the contractor or the homeowner.

The Steps to Apply

  1. Ask an Energy Advisor to confirm the address, replacement equipment and rebate before installation. Contact an Energy Advisor.
  2. Choose a participating contractor and obtain the required equipment and installation records. Participating contractors.
  3. Have the contractor submit the application with the paid invoice and required photos.

Read on October 22, 2026 from the Southern California Edison page. A change to this program is a dated line in the changelog.