Do I Qualify
- Install new equipment in a non-mobile residence within LES service territory.
- Provide matching AHRI certification and obtain a mechanical permit.
- Inverter claims require manufacturer documentation. Air-source equipment must have SEER2 and EER2 ratings.
- Air conditioners paired with electric resistance heat do not qualify.
- The incentive cannot exceed half the eligible equipment, material and third-party labor costs.
How Much Comes Off
| Equipment | Requirement | Amount |
|---|---|---|
| Air-source heat pump | <5.4 tons; EER2 ≥12.0 and SEER2 ≥15.2, or inverter-driven/variable capacity | $1,000 per system |
| Mini-split heat pump | <5.4 tons; EER2 ≥12.0 and SEER2 ≥15.2, or inverter-driven/variable capacity | $1,000 per system |
| Central air conditioner | <5.4 tons; EER2 ≥12.0 and SEER2 ≥15.2, or inverter-driven/variable capacity | $300 per system |
| Mini-split air conditioner | <5.4 tons; EER2 ≥12.0 and SEER2 ≥15.2, or inverter-driven/variable capacity | $300 per system |
| Geothermal heat pump | EER 15.0–17.99 | $1,000 per system |
| Geothermal heat pump with desuperheater | EER 15.0–17.99; with desuperheater | $1,400 per system |
| Geothermal heat pump | EER 18–21.99 | $1,200 per system |
| Geothermal heat pump with desuperheater | EER 18–21.99; with desuperheater | $1,600 per system |
| Geothermal heat pump | EER ≥22.0 | $1,400 per system |
| Geothermal heat pump with desuperheater | EER ≥22.0; with desuperheater | $1,800 per system |
Valid from January 1, 2026 to December 31, 2026.
Who Files It
A participating contractor normally files and receives payment, then credits your invoice. Direct applicants can receive payment from LES.
The provider pays either the contractor or the homeowner.
The Steps to Apply
- Choose a participating contractor and ask for incentive authorization before installation. Program and contractors.
- Install the equipment. Submit projects without preauthorization within ninety days of the invoice date.
- Check the contractor invoice for the LES credit. Contact SEP@LES.com for direct-application instructions.
Read on October 22, 2026 from the Lincoln Electric System page. The chart was printed 2026 Sustainable Energy Program. A change to this program is a dated line in the changelog.